Salem 3 | Project Glennbrook


Salem 3 | Project Glennbrook Data Center Campus

An expansion tied to the NEPA Energy Center, Salem 3 is a gigawatt-scale campus in one of Pennsylvania’s biggest energy hubs, in the same township as the Amazon and QTS campuses. It is planned around on-site generation paired with grid service, and the project pays for its own power infrastructure.

Project Detail

Salem 3 | Project Glennbrook Data Center Campus

Salem Township, PA (Luzerne County)

  • Scale: 4,466 contiguous acres
  • Power: 4 GW potential demand; on-site natural gas generation plus grid service
  • Nearby infrastructure: a 2.5 GW nuclear plant, a 1,045 MW combined-cycle gas plant, 230 kV and 500 kV transmission, and major Marcellus gas pipelines
  • Land: 194 participating landowners under one counterparty
  • Zoning: Special Data Center Overlay (SDC-O) expansion, approved by the Planning Commission on September 24, 2026; Board of Supervisors hearing October 27, 2026
  • Cooling: designed for closed-loop, low-water cooling
  • Community: $43 million Community Benefits Agreement with Salem Township proposed, including $12 million earmarked for a 42.37 acre micro-hospital site with an emergency center
  • Jobs: 1,950 permanent jobs projected at buildout; 2,300 to 3,500 across the three Salem Township campuses expected
  • Location: Northeastern Pennsylvania, inside PJM, within reach of the New York and Philadelphia metros
image of salem 3 | project glennbrook map

The 4-3 Approach: Alignment with Pennsylvania’s GRID Framework

Salem 3 follows Pennsylvania’s data center standards with developer-funded power, a proposed $43 million community investment, and a track record of community engagement and support.

Salem Township is Leading the Way


Building a hospital. Reclaiming local businesses. A place families can stay and grow.
Salem Township’s landowners, officials, and business leaders talk about what the project brings to the local economy.

This is data center development done right: progress, revitalization, and a future-first vision.

Salem 3: Frequently Asked Questions


An expansion of the township’s Special Data Center Overlay District to include Salem 3, a campus of more than 4,466 acres assembled from 194 participating landowners.

  • Overlay zoning makes the land eligible for data center development. It does not, by itself, approve construction.
  • The Salem Township Planning Commission approved the expansion on September 24, 2026. The Board of Supervisors decides next.
  • Every building would still need site plan review, land development approval, stormwater and traffic review, and state and environmental permits.

4-3 is a Pennsylvania land development company. We find land next to power, assemble it with willing landowners, and carry it through zoning.

  • NEPA Energy Center: 1,794 acres from 96 landowners and 132 parcels in Salem Township, sold to QTS / Blackstone. Closed February 25, 2026.
  • Salem 3: our lead project. Request a briefing.
  • More sites: Bradford and Tioga counties

Only part of it. The size of the assemblage is what makes room for separation.

  • Large buffers and setbacks between buildings and nearby homes
  • Screening, landscaping and existing tree cover where practical
  • The township reviews the layout through the master plan and land development process before anything is built.

Data centers need large amounts of reliable power, and Salem Township has produced power for Pennsylvania for decades.

  • A nuclear plant and a combined-cycle natural gas plant in the township
  • 230 kV and 500 kV transmission lines
  • Major Marcellus natural gas pipelines
  • Amazon and QTS campuses in the same township
  • Demand: 4 GW of potential demand at full buildout.
  • Supply: the plan pairs on-site natural gas generation with grid service.
  • Cost: the project pays for its own power and grid infrastructure, not township taxpayers.
  • Process: large users are studied by the utility and the regional grid operator before they connect.

Protecting Salem’s water is a central commitment of the project.

  • Salem 3 is designed for closed-loop, low-water cooling, which recirculates the same cooling water instead of drawing and discharging it constantly.
  • The commitment covers the whole development, including on-site generation.
  • The project must meet state and federal environmental permitting requirements.

Not very. Modern data centers are quiet neighbors.

  • Once built, there is little outdoor activity and no heavy manufacturing.
  • Most sound comes from cooling and electrical equipment, which is screened and placed away from homes.
  • Large buffers and setbacks add distance.
  • Salem 3 will meet the township’s noise ordinance.
  • Healthcare: proposed $12 million earmarked for a 42.37 acre local micro-hospital site with an emergency center. Berwick has had no emergency department since 2022.
  • Jobs: about 1,950 permanent jobs projected at full buildout expected, plus thousands of construction jobs over eight to ten years or longer.
  • Training: Luzerne County Community College has drafted a data center technician curriculum.
  • Tax base: new development broadens the tax base for the township, school district and county.
  • Local spending: more than $1.4 billion in potential land acquisition and related private investment. After the NEPA Energy Center sale, 82 of the 96 landowner families stayed within 25 miles.
  • Proposed $43 million to Salem Township
  • $12 million earmarked for a 42.37 acre local micro-hospital site with an emergency center
  • The balance supports other township priorities through the public budgeting process.
  • It is separate from the project’s obligation to pay for its own power and infrastructure.
  • Participation is voluntary. Each landowner decides whether to include their property.
  • For many farm families, it is a way to secure their family’s future without selling off land piece by piece.
  • Families from the first project have reinvested close to home. One local family bought the Berwick Brewing Company with their proceeds.
  • Large buffers keep open land between the buildings and surrounding neighborhoods.
  • Track record: we delivered the NEPA Energy Center with 96 Salem Township families.
  • Public process: zoning decisions are made in public by the Planning Commission and the Board of Supervisors.
  • Standards: Salem 3 is built to Pennsylvania’s standards for data center development.
  • Straight answers: where something has not been decided, we will say so.

Data center users and site selectors: request a briefing. Residents and landowners: contact us directly.